STAGING ENVIRONMENT

Production Setup

Configure production workflows, runs, stations, imports, and display settings.
Admin

Production Setup Sections

Production Runs

Workflow Configuration

Production Runs

Create runs under a workflow template, then configure each draft route here.
Run-first setup
RunWorkflowStatusPlannedAssignedVarianceDisplayedRouteStateActions
BUILDING1 1-636-Inch Production (6IN)OPEN3853894YesNo saved routeDRAFT
TST 64-2006-Inch Production (6IN)OPEN8054-801NoNOZZLE_FIT → NOZWELD → DRILL → FLANGE6 → MATERIALIDLOCKED
BLDG1 64-2006-Inch Production (6IN)OPEN822809-13NoNOZZLE_FIT → NOZWELD → DRILL → FLANGE6 → MATERIALIDDRAFT
TESTRUN26-Inch Production (6IN)OPEN110NoNOZZLE_FIT → NOZWELD → DRILL → FLANGE6 → MATERIALIDLOCKED
TESTRUN6-Inch Production (6IN)OPEN220NoNOZZLE_FIT → NOZWELD → DRILL → FLANGE6 → MATERIALIDLOCKED
BR2 (513-6400)1-Inch Production (1IN)OPEN588858880YesTHREAD → FLANGE1 → BENDDRAFT
BR1 - RUN1 (1-1600)1-Inch Production (1IN)FUTURE16000-1600NoNo saved routeDRAFT
BLDG1 1-631-Inch Production (1IN)FUTURE3780-378NoNo saved routeDRAFT
BR1 (513-6400)1-Inch Production (1IN)OPEN588858935NoTHREAD → FLANGE1 → BENDDRAFT
Branch Run1 (1-512)1-Inch Production (1IN)OPEN102410240NoNo saved routeDRAFT
TESTRUN1-Inch Production (1IN)OPEN110NoNo saved routeDRAFT

Bulk Spool Import

Create loaded spools assigned to a workflow and production run. Imported spools remain Not Started until Release Spool.
CSV Only
No selectable runs for the selected workflow.

Production Workflows

New Workflow
Name Code Description Display Order Station Count Active Actions
6IN 7
1IN 3
New

Board Settings

Mission, priority, supervisor message, and displayed production run are workflow-specific.

6-Inch Production

6IN
Open Display
Run Name Total Quantity Status Assigned Spools Displayed Actions
389 Edit Route Review Completion
4 View Route Review Completion
809 Edit Route Review Completion
1 View Route Review Completion
2 View Route Review Completion
New

1-Inch Production

1IN
Open Display
Run Name Total Quantity Status Assigned Spools Displayed Actions
5888 Edit Route Review Completion
0 Edit Route
0 Edit Route
5893 Edit Route Review Completion
1024 Edit Route Review Completion
1 Edit Route Review Completion
New

Stations

Changing station sequence affects future routing only. Existing production history is preserved.
Station Personnel Add Station
Workflow Sequence Station Name Code Daily Goal Display Image Kiosk Enabled Active Actions
6-Inch Production (6IN) FITUP
6-Inch Production (6IN) ROTOWELD
6-Inch Production (6IN) NOZZLE_FIT
6-Inch Production (6IN) NOZWELD
6-Inch Production (6IN) DRILL
6-Inch Production (6IN) FLANGE6
6-Inch Production (6IN) MATERIALID
1-Inch Production (1IN) THREAD
1-Inch Production (1IN) FLANGE1
1-Inch Production (1IN) BEND