STAGING ENVIRONMENT
Spool Information
APEX Spool Tracker
BR-1-162
READY TO SHIP
Production Run Branch Run1 (1-512)
Workflow / Size 1IN / Not specified
Current Location Bend Complete
Fabrication Completed 9/15/2026, 7:59:13 AM
Spool Information

BR-1-162

READY TO SHIP Bend Complete

1" Post-Fabrication

TAGGED AND CLEANED
Complete — 9/16/2026, 9:56:48 PM
READY TO SHIP
Yes

QC / Admin Correction — TAGGED AND CLEANED

Reverse this completion while retaining its audit history.

Remove Accidental Spool

This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.

Spool Identity / Production Summary

Current read-only production record.
BR-1-162
Production Workflow
1-Inch Production (1IN)
Production Run
Branch Run1 (1-512)
Status
Fabrication Complete
Current Station
Not released to production
Current Location
Bend Complete
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/15/2026, 7:59:13 AM

Material Traceability

Approved heat numbers assigned to this spool.

Main Pipe Heat

  • OC551404

WELDING TRACEABILITY

FINAL QC

Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No

SHIPPING GROUP

GroupWorkflowGroup TypeGroup StatusTarget QuantityPhysical Container IDAddedMembership
PKG-00011INCRATECOMPLETE128CRATEBR2-019/16/2026, 10:07:01 PMACTIVE
PKG-00021INCRATECOMPLETE128CRATEBR1-019/16/2026, 9:56:58 PMCorrected / removed 9/16/2026, 10:06:04 PM

Production History

9/16/2026, 9:56:48 PM
Fabrication Complete
Bend Complete
9/15/2026, 7:59:13 AM
Fabrication Complete
Bend Complete
9/13/2026, 11:00:36 AM
In Production
Bend
9/10/2026, 1:17:49 PM
In Production
Flange
9/3/2026, 3:10:50 PM
In Production
Thread
9/2/2026, 12:10:22 PM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
9/16/2026, 10:07:01 PM Shipping Group Kiosk Fabrication Complete to Fabrication Complete Bend Complete to Bend Complete Added to Shipping Group PKG-0001.
9/16/2026, 10:06:04 PM se Fabrication Complete to Fabrication Complete Bend Complete to Bend Complete Removed from Shipping Group PKG-0002: damaged
9/16/2026, 9:56:58 PM Shipping Group Kiosk Fabrication Complete to Fabrication Complete Bend Complete to Bend Complete Added to Shipping Group PKG-0002.
9/16/2026, 9:56:48 PM Tagged and Cleaned Kiosk Fabrication Complete to Fabrication Complete Bend Complete to Bend Complete Tagged and Cleaned completed; record 7
9/15/2026, 7:59:13 AM Kiosk: Bend In Production to Fabrication Complete Bend to Bend Complete Terminal production completion at Bend
9/13/2026, 11:00:36 AM Kiosk: Flange In Production to In Production Flange to Bend Production handoff Flange to Bend
9/10/2026, 1:17:49 PM Kiosk: Thread In Production to In Production Thread to Flange Production handoff Thread to Flange
9/3/2026, 3:10:50 PM Release Spool Loaded to In Production to Thread Release Spool to Thread
9/3/2026, 3:10:50 PM Release Spool Loaded to Loaded to Material Traceability: added PRIMARY_MATERIAL heat OC551404 to spool BR-1-162.

Production Run Reassignment History

No run reassignment history.