STAGING ENVIRONMENT
Spool Information
APEX Spool Tracker
MAN-1-064
In Production
Production Run TST 64-200
Workflow / Size 6IN / Not specified
Current Location Nozzle Fit-Up
Spool Information

MAN-1-064

In Production Nozzle Fit-Up

After Fabrication — Testing

No Testing Batch assigned.

After Fabrication — Dry & Cap

Dry & Cap Status
Awaiting Dry & Cap
Ready to Ship
No

Remove Accidental Spool

This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.

Spool Identity / Production Summary

Current read-only production record.
MAN-1-064
Production Workflow
6-Inch Production (6IN)
Production Run
TST 64-200
Status
In Production
Current Station
Nozzle Fit-Up
Current Location
Nozzle Fit-Up
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/15/2026, 9:47:11 AM

Material Traceability

Approved heat numbers assigned to this spool.

Main / Header Pipe Heat

No Header Pipe Heat Assigned

Nozzle Heat (1" Nozzles)

No Nozzle Heat Assigned

WELDING TRACEABILITY

FINAL QC

Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No

Production History

9/15/2026, 9:47:11 AM
In Production
Nozzle Fit-Up
9/13/2026, 12:36:35 PM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
9/15/2026, 9:47:11 AM Release Spool Loaded to In Production to Nozzle Fit-Up Release Spool to Nozzle Fit-Up; routingAuthority=RUN_ROUTE; runRouteHash=dadd58e4c4e95ef16ebc392321194534ae658a1990dfa8041f8bd0f225f4504e

Production Run Reassignment History

DateOperatorFromToReasonBatch
9/15/2026, 9:46:18 AMseBLDG1 64-200TST 64-200messed up756fed6e-6c55-46ec-9a67-0e0d0c4f6bc9