Spool Information
APEX Spool Tracker
MAN-1-067
In Production
Production Run TST 64-200
Workflow / Size 6IN / Not specified
Current Location Nozzle Fit-Up
Spool Information
MAN-1-067
In Production
Nozzle Fit-Up
After Fabrication — Testing
No Testing Batch assigned.
After Fabrication — Dry & Cap
- Dry & Cap Status
- Awaiting Dry & Cap
- Ready to Ship
- No
Remove Accidental Spool
This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.
Spool Identity / Production Summary
Current read-only production record.
MAN-1-067
Production Workflow
6-Inch Production (6IN)
Production Run
TST 64-200
Status
In Production
Current Station
Nozzle Fit-Up
Current Location
Nozzle Fit-Up
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/15/2026, 9:49:00 AM
Material Traceability
Approved heat numbers assigned to this spool.
Main / Header Pipe Heat
No Header Pipe Heat Assigned
Nozzle Heat (1" Nozzles)
No Nozzle Heat Assigned
WELDING TRACEABILITY
FINAL QC
Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No
Production History
9/15/2026, 9:49:00 AM
In Production
Nozzle Fit-Up
9/13/2026, 12:36:35 PM
Loaded
No location
Audit / QA History
| Date | Operator | Status | Location | Notes |
|---|---|---|---|---|
| 9/15/2026, 9:49:00 AM | Release Spool | Loaded to In Production | to Nozzle Fit-Up | Release Spool to Nozzle Fit-Up; routingAuthority=RUN_ROUTE; runRouteHash=dadd58e4c4e95ef16ebc392321194534ae658a1990dfa8041f8bd0f225f4504e |
Production Run Reassignment History
| Date | Operator | From | To | Reason | Batch |
|---|---|---|---|---|---|
| 9/15/2026, 9:46:18 AM | se | BLDG1 64-200 | TST 64-200 | messed up | 756fed6e-6c55-46ec-9a67-0e0d0c4f6bc9 |