Spool Information
APEX Spool Tracker
MAN-6-064
In Production
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
Current Location Fit-Up
Spool Information
MAN-6-064
In Production
Fit-Up
After Fabrication — Testing
No Testing Batch assigned.
After Fabrication — Dry & Cap
- Dry & Cap Status
- Awaiting Dry & Cap
- Ready to Ship
- No
Remove Accidental Spool
This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.
Spool Identity / Production Summary
Current read-only production record.
MAN-6-064
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
In Production
Current Station
Fit-Up
Current Location
Fit-Up
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/15/2026, 6:50:18 AM
Material Traceability
Approved heat numbers assigned to this spool.
Main / Header Pipe Heat
- Y251103G08C-2
Nozzle Heat (1" Nozzles)
No Nozzle Heat Assigned
WELDING TRACEABILITY
FINAL QC
Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No
Production History
9/15/2026, 6:50:18 AM
In Production
Fit-Up
9/13/2026, 12:36:35 PM
Loaded
No location
Audit / QA History
| Date | Operator | Status | Location | Notes |
|---|---|---|---|---|
| 9/15/2026, 6:50:18 AM | Release Spool | Loaded to In Production | to Fit-Up | Release Spool to Fit-Up |
| 9/15/2026, 6:50:18 AM | Release Spool | Loaded to Loaded | to | Material Traceability: added PRIMARY_MATERIAL heat Y251103G08C-2 to spool MAN-6-064. |
Production Run Reassignment History
No run reassignment history.