STAGING ENVIRONMENT
Spool Information
APEX Spool Tracker
STG-BEND-E-20260918
Fabrication Complete
Production Run BR1 (513-6400)
Workflow / Size 1IN / 1IN
Current Location Bend Complete
Fabrication Completed 9/18/2026, 8:04:29 AM
Spool Information

STG-BEND-E-20260918

Fabrication Complete Bend Complete

1" Post-Fabrication

TAGGED AND CLEANED
Pending
READY TO SHIP
No

Remove Accidental Spool

This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.

Spool Identity / Production Summary

Current read-only production record.
STG-BEND-E-20260918
Production Workflow
1-Inch Production (1IN)
Production Run
BR1 (513-6400)
Status
Fabrication Complete
Current Station
Not released to production
Current Location
Bend Complete
Job
STAGING-SMOKE
ISO
Drawing
Pipe Size
1IN
Material
STAGING-SMOKE
Active
Yes
Last Updated
9/18/2026, 8:04:29 AM

Notes

Controlled staging smoke for 1IN Bend autocomplete deployment

Material Traceability

Approved heat numbers assigned to this spool.

No material heats assigned.

WELDING TRACEABILITY

FINAL QC

Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No

Production History

9/18/2026, 8:04:29 AM
Fabrication Complete
Bend Complete
9/18/2026, 8:04:29 AM
In Production
Flange
9/18/2026, 8:04:29 AM
In Production
Thread
9/18/2026, 8:03:57 AM
In Production
Thread
9/18/2026, 8:03:35 AM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
9/18/2026, 8:04:29 AM Kiosk: Bend In Production to Fabrication Complete Bend to Bend Complete Terminal production completion at Bend
9/18/2026, 8:04:29 AM Kiosk: Bend In Production to In Production Thread to Flange Flange — Auto-completed by Bend handoff 2113
9/18/2026, 8:04:29 AM Kiosk: Bend In Production to In Production Thread to Thread Thread — Auto-completed by Bend handoff 2113
9/18/2026, 8:03:57 AM Release Spool Loaded to In Production to Thread Release Spool to Thread

Production Run Reassignment History

No run reassignment history.