STAGING ENVIRONMENT
Spool Information
APEX Spool Tracker
TEST-6IN-002
In Production
Production Run TESTRUN2
Workflow / Size 6IN / Not specified
Current Location Nozzle Fit-Up
Spool Information

TEST-6IN-002

In Production Nozzle Fit-Up

After Fabrication — Testing

No Testing Batch assigned.

After Fabrication — Dry & Cap

Dry & Cap Status
Awaiting Dry & Cap
Ready to Ship
No

Remove Accidental Spool

This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.

Spool Identity / Production Summary

Current read-only production record.
TEST-6IN-002
Production Workflow
6-Inch Production (6IN)
Production Run
TESTRUN2
Status
In Production
Current Station
Nozzle Fit-Up
Current Location
Nozzle Fit-Up
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/9/2026, 3:53:43 PM

Notes

TEST SPOOL FOR TESTRUN2

Material Traceability

Approved heat numbers assigned to this spool.

Main / Header Pipe Heat

No Header Pipe Heat Assigned

Nozzle Heat (1" Nozzles)

No Nozzle Heat Assigned

WELDING TRACEABILITY

FINAL QC

Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No

Production History

9/9/2026, 3:53:43 PM
In Production
Nozzle Fit-Up
9/9/2026, 3:53:05 PM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
9/9/2026, 3:53:43 PM Release Spool Loaded to In Production to Nozzle Fit-Up Release Spool to Nozzle Fit-Up; routingAuthority=RUN_ROUTE; runRouteHash=0076c8523acaade47d6988523259644487c29bbeb650cf3ace0adf98d76e9007

Production Run Reassignment History

No run reassignment history.