STAGING ENVIRONMENT
Spool Information
APEX Spool Tracker
MAN-1-014
Loaded
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
VOIDED / INACTIVE SPOOL — retained for historical and audit purposes.
Spool Information

MAN-1-014

Loaded Nozzle Fit-Up

Spool Identity / Production Summary

Current read-only production record.
MAN-1-014
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
Loaded
Current Station
Nozzle Fit-Up
Current Location
Nozzle Fit-Up
Job
ISO
Drawing
Pipe Size
Material
Active
No
Last Updated
9/11/2026, 3:19:48 PM

Notes

INACTIVE HAD TO SCRAP

Material Traceability

Approved heat numbers assigned to this spool.

Main / Header Pipe Heat

  • 553545

Nozzle Heat (1" Nozzles)

No Nozzle Heat Assigned

WELDING TRACEABILITY

ROTOWELD

Rotoweld — 8/21/2026, 3:55:00 PM

Welder information missing

FINAL QC

Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No

Production History

9/11/2026, 3:19:26 PM
Loaded
Nozzle Fit-Up
8/21/2026, 3:55:00 PM
In Production
Nozzle Fit-Up
8/21/2026, 10:08:17 AM
In Production
Rotoweld
8/20/2026, 3:52:00 PM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
9/11/2026, 3:19:48 PM Void Spool Loaded to Loaded Nozzle Fit-Up to Nozzle Fit-Up Spool voided. Reason: SCRAP
8/21/2026, 3:55:00 PM Kiosk: Rotoweld In Production to In Production Rotoweld to Nozzle Fit-Up Production handoff Rotoweld to Nozzle Fit-Up
8/21/2026, 10:08:17 AM Kiosk: Fit-Up In Production to In Production Fit-Up to Rotoweld Production handoff Fit-Up to Rotoweld
8/20/2026, 3:52:00 PM Release Spool Loaded to In Production to Fit-Up Release Spool to Fit-Up
8/20/2026, 3:52:00 PM Release Spool Loaded to Loaded to Material Traceability: added PRIMARY_MATERIAL heat 553545 to spool MAN-1-014.

Production Run Reassignment History

No run reassignment history.