Spool Information
APEX Spool Tracker
MAN-1-014
Loaded
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
VOIDED / INACTIVE SPOOL — retained for historical and audit purposes.
Spool Information
MAN-1-014
Loaded
Nozzle Fit-Up
Spool Identity / Production Summary
Current read-only production record.
MAN-1-014
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
Loaded
Current Station
Nozzle Fit-Up
Current Location
Nozzle Fit-Up
Job
ISO
Drawing
Pipe Size
Material
Active
No
Last Updated
9/11/2026, 3:19:48 PM
Notes
INACTIVE HAD TO SCRAP
Material Traceability
Approved heat numbers assigned to this spool.
Main / Header Pipe Heat
- 553545
Nozzle Heat (1" Nozzles)
No Nozzle Heat Assigned
WELDING TRACEABILITY
ROTOWELD
Rotoweld — 8/21/2026, 3:55:00 PM
Welder information missing
FINAL QC
Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No
Production History
9/11/2026, 3:19:26 PM
Loaded
Nozzle Fit-Up
8/21/2026, 3:55:00 PM
In Production
Nozzle Fit-Up
8/21/2026, 10:08:17 AM
In Production
Rotoweld
8/20/2026, 3:52:00 PM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location
Audit / QA History
| Date | Operator | Status | Location | Notes |
|---|---|---|---|---|
| 9/11/2026, 3:19:48 PM | Void Spool | Loaded to Loaded | Nozzle Fit-Up to Nozzle Fit-Up | Spool voided. Reason: SCRAP |
| 8/21/2026, 3:55:00 PM | Kiosk: Rotoweld | In Production to In Production | Rotoweld to Nozzle Fit-Up | Production handoff Rotoweld to Nozzle Fit-Up |
| 8/21/2026, 10:08:17 AM | Kiosk: Fit-Up | In Production to In Production | Fit-Up to Rotoweld | Production handoff Fit-Up to Rotoweld |
| 8/20/2026, 3:52:00 PM | Release Spool | Loaded to In Production | to Fit-Up | Release Spool to Fit-Up |
| 8/20/2026, 3:52:00 PM | Release Spool | Loaded to Loaded | to | Material Traceability: added PRIMARY_MATERIAL heat 553545 to spool MAN-1-014. |
Production Run Reassignment History
No run reassignment history.