STAGING ENVIRONMENT
Spool Information
APEX Spool Tracker
MAN-2-015
Loaded
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
VOIDED / INACTIVE SPOOL — retained for historical and audit purposes.
Spool Information

MAN-2-015

Loaded Flanging

Spool Identity / Production Summary

Current read-only production record.
MAN-2-015
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
Loaded
Current Station
Flanging
Current Location
Flanging
Job
ISO
Drawing
Pipe Size
Material
Active
No
Last Updated
9/13/2026, 11:59:08 AM

Material Traceability

Approved heat numbers assigned to this spool.

Main / Header Pipe Heat

  • 553545

Nozzle Heat (1" Nozzles)

No Nozzle Heat Assigned

WELDING TRACEABILITY

ROTOWELD

Rotoweld — 8/21/2026, 3:50:59 PM

Welder information missing

NOZZLE WELDING

Nozzle Welding — 9/9/2026, 9:27:29 AM

Welder information missing

FINAL QC

Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No

Production History

9/13/2026, 11:59:08 AM
Loaded
Flanging
9/9/2026, 12:50:11 PM
In Production
Flanging
9/9/2026, 9:27:29 AM
In Production
Drill
9/1/2026, 12:23:36 PM
In Production
Nozzle Welding
8/21/2026, 3:50:59 PM
In Production
Nozzle Fit-Up
8/21/2026, 8:35:19 AM
In Production
Rotoweld
8/21/2026, 8:28:49 AM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
9/13/2026, 11:58:58 AM Void Spool In Production to In Production Flanging to Flanging Spool voided. Reason: SCRAP
9/9/2026, 12:50:11 PM Kiosk: Drill In Production to In Production Drill to Flanging Production handoff Drill to Flanging
9/9/2026, 9:27:29 AM Kiosk: Nozzle Welding In Production to In Production Nozzle Welding to Drill Production handoff Nozzle Welding to Drill
9/1/2026, 12:23:36 PM Kiosk: Nozzle Fit-Up In Production to In Production Nozzle Fit-Up to Nozzle Welding Production handoff Nozzle Fit-Up to Nozzle Welding
8/21/2026, 3:50:59 PM Kiosk: Rotoweld In Production to In Production Rotoweld to Nozzle Fit-Up Production handoff Rotoweld to Nozzle Fit-Up
8/21/2026, 8:35:19 AM Kiosk: Fit-Up In Production to In Production Fit-Up to Rotoweld Production handoff Fit-Up to Rotoweld
8/21/2026, 8:28:49 AM Release Spool Loaded to In Production to Fit-Up Release Spool to Fit-Up
8/21/2026, 8:28:49 AM Release Spool Loaded to Loaded to Material Traceability: added PRIMARY_MATERIAL heat 553545 to spool MAN-2-015.

Production Run Reassignment History

No run reassignment history.