MAN-3-003
In Production
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
Current Location Document
Spool Information

MAN-3-003

In Production Document

After Fabrication — Testing

No Testing Batch assigned.

After Fabrication — Dry & Cap

Dry & Cap Status
Awaiting Dry & Cap
Ready to Ship
No

Remove Accidental Spool

This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.

Spool Identity / Production Summary

Current read-only production record.
MAN-3-003
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
In Production
Current Station
Document
Current Location
Document
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/15/2026, 7:30:38 AM

Material Traceability

Approved heat numbers assigned to this spool.

Main / Header Pipe Heat

No Header Pipe Heat Assigned

Nozzle Heat (1" Nozzles)

No Nozzle Heat Assigned

WELDING TRACEABILITY

ROTOWELD

Rotoweld — 8/19/2026, 4:08:22 PM

Welder information missing

NOZZLE WELDING

Nozzle Welding — 9/10/2026, 12:30:47 PM

Welder information missing

FINAL QC

Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No

Production History

9/15/2026, 7:30:38 AM
In Production
Document
9/14/2026, 10:36:33 AM
In Production
Flanging
9/10/2026, 12:30:47 PM
In Production
Drill
9/3/2026, 12:49:57 PM
In Production
Nozzle Welding
8/19/2026, 4:08:22 PM
In Production
Nozzle Fit-Up
8/19/2026, 4:08:17 PM
In Production
Rotoweld
8/18/2026, 3:16:57 PM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
9/15/2026, 7:30:38 AM Kiosk: Flanging In Production to In Production Flanging to Document Production handoff Flanging to Document
9/14/2026, 10:36:33 AM Kiosk: Drill In Production to In Production Drill to Flanging Production handoff Drill to Flanging
9/10/2026, 12:30:47 PM Kiosk: Nozzle Welding In Production to In Production Nozzle Welding to Drill Production handoff Nozzle Welding to Drill
9/3/2026, 12:49:57 PM Kiosk: Nozzle Fit-Up In Production to In Production Nozzle Fit-Up to Nozzle Welding Production handoff Nozzle Fit-Up to Nozzle Welding
8/19/2026, 4:08:22 PM Kiosk: Rotoweld In Production to In Production Rotoweld to Nozzle Fit-Up Production handoff Rotoweld to Nozzle Fit-Up
8/19/2026, 4:08:17 PM Kiosk: Fit-Up In Production to In Production Fit-Up to Rotoweld Production handoff Fit-Up to Rotoweld
8/18/2026, 3:16:57 PM QA Release Loaded to In Production to Fit-Up QA Release to Fit-Up