Spool Information
APEX Spool Tracker
MAN-4-013
In Production
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
Current Location Document
Spool Information
MAN-4-013
In Production
Document
After Fabrication — Testing
No Testing Batch assigned.
After Fabrication — Dry & Cap
- Dry & Cap Status
- Awaiting Dry & Cap
- Ready to Ship
- No
Remove Accidental Spool
This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.
Spool Identity / Production Summary
Current read-only production record.
MAN-4-013
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
In Production
Current Station
Document
Current Location
Document
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/15/2026, 6:50:01 AM
Material Traceability
Approved heat numbers assigned to this spool.
Main / Header Pipe Heat
No Header Pipe Heat Assigned
Nozzle Heat (1" Nozzles)
No Nozzle Heat Assigned
WELDING TRACEABILITY
ROTOWELD
Rotoweld — 8/27/2026, 3:30:09 PM
Welder information missing
NOZZLE WELDING
Nozzle Welding — 9/11/2026, 12:57:17 PM
Welder information missing
FINAL QC
Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No
Production History
9/15/2026, 6:50:01 AM
In Production
Document
9/11/2026, 1:59:52 PM
In Production
Flanging
9/11/2026, 12:57:17 PM
In Production
Drill
9/3/2026, 6:16:30 AM
In Production
Nozzle Welding
8/27/2026, 3:30:09 PM
In Production
Nozzle Fit-Up
8/27/2026, 3:28:40 PM
In Production
Rotoweld
8/27/2026, 3:27:21 PM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location
Audit / QA History
| Date | Operator | Status | Location | Notes |
|---|---|---|---|---|
| 9/15/2026, 6:50:01 AM | Kiosk: Flanging | In Production to In Production | Flanging to Document | Production handoff Flanging to Document |
| 9/11/2026, 1:59:52 PM | Kiosk: Drill | In Production to In Production | Drill to Flanging | Production handoff Drill to Flanging |
| 9/11/2026, 12:57:17 PM | Kiosk: Nozzle Welding | In Production to In Production | Nozzle Welding to Drill | Production handoff Nozzle Welding to Drill |
| 9/3/2026, 6:16:30 AM | Kiosk: Nozzle Fit-Up | In Production to In Production | Nozzle Fit-Up to Nozzle Welding | Production handoff Nozzle Fit-Up to Nozzle Welding |
| 8/27/2026, 3:30:09 PM | Kiosk: Rotoweld | In Production to In Production | Rotoweld to Nozzle Fit-Up | Production handoff Rotoweld to Nozzle Fit-Up |
| 8/27/2026, 3:28:40 PM | Kiosk: Fit-Up | In Production to In Production | Fit-Up to Rotoweld | Production handoff Fit-Up to Rotoweld |
| 8/27/2026, 3:27:21 PM | Release Spool | Loaded to In Production | to Fit-Up | Release Spool to Fit-Up |
Production Run Reassignment History
No run reassignment history.