Spool Information
APEX Spool Tracker
MAN-6-001
LOADED
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
Current Location Document Complete
Fabrication Completed 9/14/2026, 2:44:22 PM
Spool Information
MAN-6-001
LOADED
Document Complete
After Fabrication — Testing
- Testing Batch
- TEST-0001
- Status
- Testing Complete
- Completed
- 9/18/2026, 3:15:11 PM
- Completed By
- Codex Staging E2E 2026-09-18
- Hydro Report
- Not Linked
- Passivation Report
- Not Linked
After Fabrication — Dry & Cap
- Dry & Cap Status
- Dry & Cap Complete
- Completed
- 9/18/2026, 3:43:45 PM
- Completed By
- 6IN Dry & Cap Kiosk
- Ready to Ship
- No
QC / Admin Correction
Reverse this completion when the physical spool needs Dry & Cap again. The original record stays in history.
Correction History
Completed 9/18/2026, 3:40:27 PM by 6IN Dry & Cap Kiosk; reversed 9/18/2026, 3:40:28 PM by 6IN Dry & Cap Kiosk — Kiosk undo
Completed 9/18/2026, 3:22:55 PM by SE; reversed 9/18/2026, 3:40:27 PM by Codex Staging Validation — Reset existing staging test completion before approved attribution validation
Completed 9/18/2026, 3:18:04 PM by Codex Staging E2E 2026-09-18; reversed 9/18/2026, 3:18:04 PM by Codex Staging E2E 2026-09-18 — Kiosk undo
After Fabrication — 6IN Load
LOADED — LOAD-0001
- Loaded
- 9/18/2026, 4:44:18 PM
- Loaded By
- Codex Staging Admin
Final Loading QC — Version 1
- Spool is on the correct load/truck.: Confirmed
- Final loading condition and securement verified.: Confirmed
Corrected / Removed Load History
LOAD-0002 — Corrected / Removed
Loaded 9/18/2026, 4:43:36 PM by Codex Staging Selector; removed 9/18/2026, 4:44:18 PM by Codex Staging Selector: Return controlled spool after selector validation
Loaded 9/18/2026, 4:43:36 PM by Codex Staging Selector; removed 9/18/2026, 4:44:18 PM by Codex Staging Selector: Return controlled spool after selector validation
- Spool is on the correct load/truck.: Confirmed
- Final loading condition and securement verified.: Confirmed
LOAD-0001 — Corrected / Removed
Loaded 9/18/2026, 4:41:31 PM by Codex Staging Admin; removed 9/18/2026, 4:43:36 PM by Codex Staging Selector: Move controlled spool for multiple-open cleanup
Loaded 9/18/2026, 4:41:31 PM by Codex Staging Admin; removed 9/18/2026, 4:43:36 PM by Codex Staging Selector: Move controlled spool for multiple-open cleanup
- Spool is on the correct load/truck.: Confirmed
- Final loading condition and securement verified.: Confirmed
LOAD-0001 — Corrected / Removed
Loaded 9/18/2026, 4:38:36 PM by 6IN Load Kiosk; removed 9/18/2026, 4:40:17 PM by Codex Staging QC: Commit 4 controlled removal validation
Loaded 9/18/2026, 4:38:36 PM by 6IN Load Kiosk; removed 9/18/2026, 4:40:17 PM by Codex Staging QC: Commit 4 controlled removal validation
- Spool is on the correct load/truck.: Confirmed
- Final loading condition and securement verified.: Confirmed
Remove Accidental Spool
This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.
Spool Identity / Production Summary
Current read-only production record.
MAN-6-001
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
Fabrication Complete
Current Station
Not released to production
Current Location
Document Complete
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/14/2026, 2:44:22 PM
Material Traceability
Approved heat numbers assigned to this spool.
Main / Header Pipe Heat
- 552605
Nozzle Heat (1" Nozzles)
- OC551404
WELDING TRACEABILITY
ROTOWELD
Rotoweld — 8/18/2026, 4:10:00 PM
- R — Rich Fiorvanti
NOZZLE WELDING
Nozzle Welding — 9/10/2026, 8:29:37 AM
- CR — Cayla Reeder
- W — Wayne Perry
FINAL QC
Markings Removed: COMPLETE
Tag Attached: COMPLETE
Document Completed: Yes — 9/14/2026, 2:44:22 PM
Production History
9/18/2026, 4:44:18 PM
Loaded
Document Complete
9/18/2026, 4:44:18 PM
Ready to Ship
Document Complete
9/18/2026, 4:43:36 PM
Loaded
Document Complete
9/18/2026, 4:43:36 PM
Ready to Ship
Document Complete
9/18/2026, 4:41:31 PM
Loaded
Document Complete
9/18/2026, 4:40:17 PM
Ready to Ship
Document Complete
9/18/2026, 4:38:36 PM
Loaded
Document Complete
9/18/2026, 3:43:45 PM
Ready to Ship
Document Complete
9/18/2026, 3:40:28 PM
Awaiting Dry & Cap
Document Complete
9/18/2026, 3:40:27 PM
Ready to Ship
Document Complete
9/18/2026, 3:40:27 PM
Awaiting Dry & Cap
Document Complete
9/18/2026, 3:22:55 PM
Ready to Ship
Document Complete
9/18/2026, 3:18:04 PM
Awaiting Dry & Cap
Document Complete
9/18/2026, 3:18:04 PM
Ready to Ship
Document Complete
9/14/2026, 2:44:22 PM
Fabrication Complete
Document Complete
9/12/2026, 2:57:17 PM
In Production
Document
9/10/2026, 9:27:19 AM
In Production
Flanging
9/10/2026, 8:29:37 AM
In Production
Drill
9/1/2026, 2:54:56 PM
In Production
Nozzle Welding
8/18/2026, 4:10:00 PM
In Production
Nozzle Fit-Up
8/18/2026, 3:58:23 PM
In Production
Rotoweld
8/18/2026, 2:40:29 PM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location
Audit / QA History
| Date | Operator | Status | Location | Notes |
|---|---|---|---|---|
| 9/18/2026, 4:44:18 PM | Codex Staging Admin | Ready to Ship to Loaded | Document Complete to Document Complete | Admin manual add: Restore controlled Commit 4 final state; loaded onto LOAD-0001; membership 4. |
| 9/18/2026, 4:44:18 PM | Codex Staging Selector | Loaded to Ready to Ship | Document Complete to Document Complete | Removed from LOAD-0002: Return controlled spool after selector validation; membership 3. |
| 9/18/2026, 4:43:36 PM | Codex Staging Selector | Ready to Ship to Loaded | Document Complete to Document Complete | Admin manual add: Temporarily populate selector test load; loaded onto LOAD-0002; membership 3. |
| 9/18/2026, 4:43:36 PM | Codex Staging Selector | Loaded to Ready to Ship | Document Complete to Document Complete | Removed from LOAD-0001: Move controlled spool for multiple-open cleanup; membership 2. |
| 9/18/2026, 4:41:31 PM | Codex Staging Admin | Ready to Ship to Loaded | Document Complete to Document Complete | Admin manual add: Commit 4 controlled manual re-add; loaded onto LOAD-0001; membership 2. |
| 9/18/2026, 4:40:17 PM | Codex Staging QC | Loaded to Ready to Ship | Document Complete to Document Complete | Removed from LOAD-0001: Commit 4 controlled removal validation; membership 1. |
| 9/18/2026, 4:38:36 PM | 6IN Load Kiosk | Ready to Ship to Loaded | Document Complete to Document Complete | 6IN Load kiosk; loaded onto LOAD-0001; membership 1. |
| 9/18/2026, 3:43:45 PM | 6IN Dry & Cap Kiosk | Awaiting Dry & Cap to Ready to Ship | Document Complete to Document Complete | Dry & Cap completed; record 4 |
| 9/18/2026, 3:40:28 PM | 6IN Dry & Cap Kiosk | Ready to Ship to Awaiting Dry & Cap | Document Complete to Document Complete | Dry & Cap kiosk undo; record 3 |
| 9/18/2026, 3:40:27 PM | 6IN Dry & Cap Kiosk | Awaiting Dry & Cap to Ready to Ship | Document Complete to Document Complete | Dry & Cap completed; record 3 |
| 9/18/2026, 3:40:27 PM | Codex Staging Validation | Ready to Ship to Awaiting Dry & Cap | Document Complete to Document Complete | Dry & Cap QC correction: Reset existing staging test completion before approved attribution validation; record 2 |
| 9/18/2026, 3:22:55 PM | SE | Awaiting Dry & Cap to Ready to Ship | Document Complete to Document Complete | Dry & Cap completed; record 2 |
| 9/18/2026, 3:18:04 PM | Codex Staging E2E 2026-09-18 | Ready to Ship to Awaiting Dry & Cap | Document Complete to Document Complete | Dry & Cap kiosk undo; record 1 |
| 9/18/2026, 3:18:04 PM | Codex Staging E2E 2026-09-18 | Awaiting Dry & Cap to Ready to Ship | Document Complete to Document Complete | Dry & Cap completed; record 1 |
| 9/14/2026, 2:44:22 PM | Kiosk: Document | In Production to Fabrication Complete | Document to Document Complete | Terminal production completion at Document |
| 9/14/2026, 2:44:22 PM | Document QC | In Production to In Production | Document to Document | Material Traceability: added NOZZLE heat OC551404 to spool MAN-6-001. |
| 9/12/2026, 2:57:17 PM | Kiosk: Flanging | In Production to In Production | Flanging to Document | Production handoff Flanging to Document |
| 9/10/2026, 9:27:19 AM | Kiosk: Drill | In Production to In Production | Drill to Flanging | Production handoff Drill to Flanging |
| 9/10/2026, 8:29:37 AM | Kiosk: Nozzle Welding | In Production to In Production | Nozzle Welding to Drill | Production handoff Nozzle Welding to Drill |
| 9/1/2026, 2:54:56 PM | Kiosk: Nozzle Fit-Up | In Production to In Production | Nozzle Fit-Up to Nozzle Welding | Production handoff Nozzle Fit-Up to Nozzle Welding |
| 8/18/2026, 4:10:00 PM | Kiosk: Rotoweld | In Production to In Production | Rotoweld to Nozzle Fit-Up | Production handoff Rotoweld to Nozzle Fit-Up |
| 8/18/2026, 3:58:23 PM | Kiosk: Fit-Up | In Production to In Production | Fit-Up to Rotoweld | Production handoff Fit-Up to Rotoweld |
| 8/18/2026, 2:41:00 PM | Material Traceability | In Production to In Production | Fit-Up to Fit-Up | Material Traceability: added HEADER_PIPE heat 552605 to spool MAN-6-001. |
| 8/18/2026, 2:40:29 PM | QA Release | Loaded to In Production | to Fit-Up | QA Release to Fit-Up |
Production Run Reassignment History
No run reassignment history.