STAGING ENVIRONMENT
Spool Information
APEX Spool Tracker
MAN-6-030
In Production
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
Current Location Nozzle Fit-Up
Spool Information

MAN-6-030

In Production Nozzle Fit-Up

After Fabrication — Testing

No Testing Batch assigned.

After Fabrication — Dry & Cap

Dry & Cap Status
Awaiting Dry & Cap
Ready to Ship
No

Remove Accidental Spool

This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.

Spool Identity / Production Summary

Current read-only production record.
MAN-6-030
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
In Production
Current Station
Nozzle Fit-Up
Current Location
Nozzle Fit-Up
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
8/26/2026, 11:39:03 AM

Material Traceability

Approved heat numbers assigned to this spool.

Main / Header Pipe Heat

  • 551691

Nozzle Heat (1" Nozzles)

No Nozzle Heat Assigned

WELDING TRACEABILITY

ROTOWELD

Rotoweld — 8/26/2026, 11:39:03 AM

Welder information missing

FINAL QC

Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No

Production History

8/26/2026, 11:39:03 AM
In Production
Nozzle Fit-Up
8/26/2026, 11:22:16 AM
In Production
Rotoweld
8/25/2026, 10:16:16 AM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
8/26/2026, 11:39:03 AM Kiosk: Rotoweld In Production to In Production Rotoweld to Nozzle Fit-Up Production handoff Rotoweld to Nozzle Fit-Up
8/26/2026, 11:22:16 AM Kiosk: Fit-Up In Production to In Production Fit-Up to Rotoweld Production handoff Fit-Up to Rotoweld
8/25/2026, 10:16:16 AM Release Spool Loaded to In Production to Fit-Up Release Spool to Fit-Up
8/25/2026, 10:16:16 AM Release Spool Loaded to Loaded to Material Traceability: added PRIMARY_MATERIAL heat 551691 to spool MAN-6-030.

Production Run Reassignment History

No run reassignment history.