Spool Information
APEX Spool Tracker
MAN-6-058
In Production
Production Run BLDG1 64-200
Workflow / Size 6IN / Not specified
Current Location Fit-Up
Spool Information
MAN-6-058
In Production
Fit-Up
After Fabrication — Testing
No Testing Batch assigned.
After Fabrication — Dry & Cap
- Dry & Cap Status
- Awaiting Dry & Cap
- Ready to Ship
- No
Remove Accidental Spool
This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.
Spool Identity / Production Summary
Current read-only production record.
MAN-6-058
Production Workflow
6-Inch Production (6IN)
Production Run
BLDG1 64-200
Status
In Production
Current Station
Fit-Up
Current Location
Fit-Up
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/14/2026, 12:09:56 PM
Material Traceability
Approved heat numbers assigned to this spool.
Main / Header Pipe Heat
- Y251103G08C-2
Nozzle Heat (1" Nozzles)
No Nozzle Heat Assigned
WELDING TRACEABILITY
FINAL QC
Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No
Production History
9/14/2026, 12:09:56 PM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location
Audit / QA History
| Date | Operator | Status | Location | Notes |
|---|---|---|---|---|
| 9/14/2026, 12:09:56 PM | Release Spool | Loaded to In Production | to Fit-Up | Release Spool to Fit-Up |
| 9/14/2026, 12:09:56 PM | Release Spool | Loaded to Loaded | to | Material Traceability: added PRIMARY_MATERIAL heat Y251103G08C-2 to spool MAN-6-058. |
Production Run Reassignment History
| Date | Operator | From | To | Reason | Batch |
|---|---|---|---|---|---|
| 9/13/2026, 12:23:07 PM | SE | BUILDING1 1-63 | BLDG1 64-200 | SHORTER PIPE NO NEED TO BUTT WELD | f3cd1cd1-81c7-4868-b82a-bee9185e5d7c |