STAGING ENVIRONMENT
Spool Information
APEX Spool Tracker
Man-2-020
Loaded
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
Current Location Not recorded
Spool Information

Man-2-020

Loaded No location

After Fabrication — Testing

No Testing Batch assigned.

After Fabrication — Dry & Cap

Dry & Cap Status
Awaiting Dry & Cap
Ready to Ship
No

Remove Accidental Spool

This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.

Spool Identity / Production Summary

Current read-only production record.
Man-2-020
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
Loaded
Current Station
Not released to production
Current Location
No location
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
8/24/2026, 10:25:53 AM

Material Traceability

Approved heat numbers assigned to this spool.

Main / Header Pipe Heat

No Header Pipe Heat Assigned

Nozzle Heat (1" Nozzles)

No Nozzle Heat Assigned

WELDING TRACEABILITY

FINAL QC

Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No

Production History

8/24/2026, 10:25:53 AM
Loaded
No location
8/24/2026, 10:24:07 AM
In Production
No location
8/21/2026, 11:15:37 PM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
8/24/2026, 10:25:53 AM SE In Production to Loaded to
8/24/2026, 10:24:07 AM SE Loaded to In Production to

Production Run Reassignment History

No run reassignment history.