Spool Information
APEX Spool Tracker
Man-1-021
Loaded
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
Current Location Not recorded
Spool Information
Man-1-021
Loaded
No location
After Fabrication — Testing
No Testing Batch assigned.
After Fabrication — Dry & Cap
- Dry & Cap Status
- Awaiting Dry & Cap
- Ready to Ship
- No
Remove Accidental Spool
This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.
Spool Identity / Production Summary
Current read-only production record.
Man-1-021
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
Loaded
Current Station
Not released to production
Current Location
No location
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
8/24/2026, 10:26:13 AM
Material Traceability
Approved heat numbers assigned to this spool.
Main / Header Pipe Heat
No Header Pipe Heat Assigned
Nozzle Heat (1" Nozzles)
No Nozzle Heat Assigned
WELDING TRACEABILITY
FINAL QC
Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No
Production History
8/24/2026, 10:26:13 AM
Loaded
No location
8/24/2026, 10:22:31 AM
In Production
No location
8/21/2026, 11:21:02 PM
Loaded
No location
Audit / QA History
| Date | Operator | Status | Location | Notes |
|---|---|---|---|---|
| 8/24/2026, 10:26:13 AM | SE | In Production to Loaded | to | |
| 8/24/2026, 10:22:31 AM | SE | Loaded to In Production | to |
Production Run Reassignment History
No run reassignment history.