Spool Information
APEX Spool Tracker
TST3
Loaded
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
VOIDED / INACTIVE SPOOL — retained for historical and audit purposes.
Spool Information
TST3
Loaded
TEST
Spool Identity / Production Summary
Current read-only production record.
TST3
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
Loaded
Current Station
Fit-Up
Current Location
TEST
Job
ISO
Drawing
Pipe Size
Material
Active
No
Last Updated
9/1/2026, 6:41:54 PM
Material Traceability
Approved heat numbers assigned to this spool.
Main / Header Pipe Heat
No Header Pipe Heat Assigned
Nozzle Heat (1" Nozzles)
No Nozzle Heat Assigned
WELDING TRACEABILITY
FINAL QC
Markings Removed: NOT COMPLETE
Tag Attached: NOT COMPLETE
Document Completed: No
Production History
9/1/2026, 6:41:54 PM
Loaded
TEST
9/1/2026, 6:41:09 PM
In Production
Fit-Up
9/1/2026, 6:40:38 PM
Loaded
No location
Audit / QA History
| Date | Operator | Status | Location | Notes |
|---|---|---|---|---|
| 9/1/2026, 6:41:27 PM | Void Spool | In Production to In Production | Fit-Up to Fit-Up | Spool voided. Reason: test spool |
| 9/1/2026, 6:41:09 PM | Release Spool | Loaded to In Production | to Fit-Up | Release Spool to Fit-Up |
Production Run Reassignment History
No run reassignment history.