Spool Information
APEX Spool Tracker
MAN-1-013
Fabrication Complete
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
Current Location Document Complete
Fabrication Completed 9/14/2026, 2:40:54 PM
Spool Information
MAN-1-013
Fabrication Complete
Document Complete
After Fabrication — Testing
- Testing Batch
- TEST-0002
- Status
- In Testing
- Hydro Report
- Not Linked
- Passivation Report
- Not Linked
After Fabrication — Dry & Cap
- Dry & Cap Status
- Awaiting Dry & Cap
- Ready to Ship
- No
Remove Accidental Spool
This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.
Spool Identity / Production Summary
Current read-only production record.
MAN-1-013
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
Fabrication Complete
Current Station
Not released to production
Current Location
Document Complete
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/14/2026, 2:40:54 PM
Material Traceability
Approved heat numbers assigned to this spool.
Main / Header Pipe Heat
- 551691
Nozzle Heat (1" Nozzles)
- OC551404
WELDING TRACEABILITY
ROTOWELD
Rotoweld — 8/27/2026, 3:29:48 PM
- R — Rich Fiorvanti
NOZZLE WELDING
Nozzle Welding — 9/11/2026, 3:10:44 PM
- 130 — Juan Numez
- W — Wayne Perry
FINAL QC
Markings Removed: COMPLETE
Tag Attached: COMPLETE
Document Completed: Yes — 9/14/2026, 2:40:54 PM
Production History
9/14/2026, 2:40:54 PM
Fabrication Complete
Document Complete
9/14/2026, 8:30:15 AM
In Production
Document
9/12/2026, 8:17:03 AM
In Production
Flanging
9/11/2026, 3:10:44 PM
In Production
Drill
9/3/2026, 3:25:22 PM
In Production
Nozzle Welding
8/27/2026, 3:29:48 PM
In Production
Nozzle Fit-Up
8/27/2026, 3:28:20 PM
In Production
Rotoweld
8/27/2026, 3:27:15 PM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location
Audit / QA History
| Date | Operator | Status | Location | Notes |
|---|---|---|---|---|
| 9/19/2026, 7:07:18 AM | Staging Report Layout Setup | to | to | Added to Testing Batch TEST-0002. |
| 9/14/2026, 2:40:54 PM | Kiosk: Document | In Production to Fabrication Complete | Document to Document Complete | Terminal production completion at Document |
| 9/14/2026, 2:40:54 PM | Document QC | In Production to In Production | Document to Document | Material Traceability: added NOZZLE heat OC551404 to spool MAN-1-013. |
| 9/14/2026, 2:40:54 PM | Document QC | In Production to In Production | Document to Document | Material Traceability: added PRIMARY_MATERIAL heat 551691 to spool MAN-1-013. |
| 9/14/2026, 8:30:15 AM | Kiosk: Flanging | In Production to In Production | Flanging to Document | Production handoff Flanging to Document |
| 9/12/2026, 8:17:03 AM | Kiosk: Drill | In Production to In Production | Drill to Flanging | Production handoff Drill to Flanging |
| 9/11/2026, 3:10:44 PM | Kiosk: Nozzle Welding | In Production to In Production | Nozzle Welding to Drill | Production handoff Nozzle Welding to Drill |
| 9/3/2026, 3:25:22 PM | Kiosk: Nozzle Fit-Up | In Production to In Production | Nozzle Fit-Up to Nozzle Welding | Production handoff Nozzle Fit-Up to Nozzle Welding |
| 8/27/2026, 3:29:48 PM | Kiosk: Rotoweld | In Production to In Production | Rotoweld to Nozzle Fit-Up | Production handoff Rotoweld to Nozzle Fit-Up |
| 8/27/2026, 3:28:20 PM | Kiosk: Fit-Up | In Production to In Production | Fit-Up to Rotoweld | Production handoff Fit-Up to Rotoweld |
| 8/27/2026, 3:27:15 PM | Release Spool | Loaded to In Production | to Fit-Up | Release Spool to Fit-Up |
Production Run Reassignment History
No run reassignment history.