STAGING ENVIRONMENT
Spool Information
APEX Spool Tracker
MAN-4-009
Fabrication Complete
Production Run BUILDING1 1-63
Workflow / Size 6IN / Not specified
Current Location Document Complete
Fabrication Completed 9/14/2026, 2:34:24 PM
Spool Information

MAN-4-009

Fabrication Complete Document Complete

After Fabrication — Testing

Testing Batch
TEST-0002
Status
In Testing
Hydro Report
Not Linked
Passivation Report
Not Linked

After Fabrication — Dry & Cap

Dry & Cap Status
Awaiting Dry & Cap
Ready to Ship
No

Remove Accidental Spool

This spool has history and cannot be deleted. Void it to preserve traceability and remove it from active production.

Spool Identity / Production Summary

Current read-only production record.
MAN-4-009
Production Workflow
6-Inch Production (6IN)
Production Run
BUILDING1 1-63
Status
Fabrication Complete
Current Station
Not released to production
Current Location
Document Complete
Job
ISO
Drawing
Pipe Size
Material
Active
Yes
Last Updated
9/14/2026, 2:34:24 PM

Material Traceability

Approved heat numbers assigned to this spool.

Main / Header Pipe Heat

  • 551678

Nozzle Heat (1" Nozzles)

  • OC551404

WELDING TRACEABILITY

ROTOWELD

Rotoweld — 8/20/2026, 4:13:10 PM
  • R — Rich Fiorvanti

NOZZLE WELDING

Nozzle Welding — 9/10/2026, 2:32:42 PM
  • W — Wayne Perry

FINAL QC

Markings Removed: COMPLETE
Tag Attached: COMPLETE
Document Completed: Yes — 9/14/2026, 2:34:24 PM

Production History

9/14/2026, 2:34:24 PM
Fabrication Complete
Document Complete
9/10/2026, 2:32:54 PM
In Production
Document
9/10/2026, 2:32:51 PM
In Production
Flanging
9/10/2026, 2:32:42 PM
In Production
Drill
9/5/2026, 12:59:05 PM
In Production
Nozzle Welding
8/20/2026, 4:13:10 PM
In Production
Nozzle Fit-Up
8/20/2026, 4:13:05 PM
In Production
Rotoweld
8/19/2026, 3:34:19 PM
In Production
Fit-Up
8/18/2026, 12:55:06 PM
Loaded
No location

Audit / QA History

DateOperatorStatusLocationNotes
9/19/2026, 7:07:18 AM Staging Report Layout Setup to to Added to Testing Batch TEST-0002.
9/14/2026, 2:34:24 PM Kiosk: Document In Production to Fabrication Complete Document to Document Complete Terminal production completion at Document
9/14/2026, 2:34:24 PM Document QC In Production to In Production Document to Document Material Traceability: added NOZZLE heat OC551404 to spool MAN-4-009.
9/10/2026, 2:32:54 PM Kiosk: Flanging In Production to In Production Flanging to Document Production handoff Flanging to Document
9/10/2026, 2:32:51 PM Kiosk: Drill In Production to In Production Drill to Flanging Production handoff Drill to Flanging
9/10/2026, 2:32:42 PM Kiosk: Nozzle Welding In Production to In Production Nozzle Welding to Drill Production handoff Nozzle Welding to Drill
9/5/2026, 12:59:05 PM Kiosk: Nozzle Fit-Up In Production to In Production Nozzle Fit-Up to Nozzle Welding Production handoff Nozzle Fit-Up to Nozzle Welding
8/20/2026, 4:13:10 PM Kiosk: Rotoweld In Production to In Production Rotoweld to Nozzle Fit-Up Production handoff Rotoweld to Nozzle Fit-Up
8/20/2026, 4:13:05 PM Kiosk: Fit-Up In Production to In Production Fit-Up to Rotoweld Production handoff Fit-Up to Rotoweld
8/19/2026, 3:34:19 PM QA Release Loaded to In Production to Fit-Up QA Release to Fit-Up
8/19/2026, 3:34:19 PM QA Release Loaded to Loaded to Material Traceability: added PRIMARY_MATERIAL heat 551678 to spool MAN-4-009.

Production Run Reassignment History

No run reassignment history.